
Hardware failure cost is not just the price of a part. It includes fabrication, lead time, assembly, testing, communication, and lost trust.
Before the first prototype, teams can reduce risk by defining use context, loads, interfaces, manufacturing assumptions, and the specific decision the prototype should answer.
The goal is not to remove all uncertainty. It is to test the most uncertain decision in the smallest useful unit.